Acme Oil serice and Repair
Acme Oil Service and Repair Acmer oil Service and Repair

Pumping Unit Service



Equipment Listing

Service Rig #1 - 3 Ton International Truck w/fully equipped service bed
Service Rates
#1 - Inspect, Lubricate Pitman, Saddle & Tail Bearings
 
      • Unit Size Smaller than 228 ...............................................................................................................
      • Unit Size 228 TO 456 .........................................................................................................................
      • Unit Larger than 456 ..........................................................................................................................
$125.00/unit
$150.00/unit
$175.00/unit

• Fuel Surcharge .........................................................................................................................................

8%

#1 – Inspect, Drain, Clean Gear Case, and Refill ................................................................................       • If Gear Case Oil must be replaced, rates are as follows:
            • New AGMA #6 Oil .........................................................................................................................

$50.00/unit

$1.25/Lb
Miscellaneous Charges
Additional Hand ..........................................................................................................................................

$30.00/hr


Standard Operating Procedures

  1. Operator leaves greasing machinery in operative position, unreels grease and oil hose.
  2. Puts engine or electric motor in an in-operative condition.
  3. Looks over unit to spot leaky seals, decides on proper lubricant, unless previously instructed
  4. by owner in this regard.
  5. All pop off valves removed and discarded.
  6. New grease or oil is forced by power driven machinery through bearings until new grease or oil appears in pop off opening, then new pop off valve and plug inserted and unit left in operating position.
  7. Inspects gear box lubricant and makes determination of condition, replaces with new AGMA #6 oil if necesary.
  8. Report filled out on entire unit.


Click to Download OUr Brochure
Pumping Units Texas
P/U Service | P/U Repair | Roustabout | Blast & Paint | Gallery | For Sale | Contact | Home
Click to Download OUr Brochure